Now Streaming: #FutureReady Data Centers When Power is an Obstacle.📽 Watch our full #LinkedInLiveEvent recording on resilient access to #EnergySolutions for your #DataCenter. 👇
About us
Black & Veatch is an employee-owned, global leader in building critical human infrastructure in Energy, Water, Digital Connectivity and Government Services. Since 1915, we have helped our clients improve business operations and the lives of people in over 100 countries through consulting, engineering, construction, operations and program management. Our purpose is building a world of difference and our vision is THE leader in sustainable infrastructure. Black & Veatch Holding Company, its subsidiaries and its affiliated companies, complies with all Equal Employment Opportunity (EEO) affirmative action laws and regulations. Black & Veatch does not discriminate on the basis of age, race, religion, color, sex, national origin, marital status, genetic information, sexual orientation, gender Identity and expression, disability, veteran status, pregnancy status or other status protected by law.
- Website
-
https://www.bv.com/
External link for Black & Veatch
- Industry
- Engineering Services
- Company size
- 10,001+ employees
- Headquarters
- Overland Park, KS
- Type
- Privately Held
- Founded
- 1915
- Specialties
- Security
Locations
-
Primary
11401 Lamar Avenue
Overland Park, KS 66211, US
-
1S, Jalan T. B. Simatupang
Jakarta, Jakarta 12560, ID
Employees at Black & Veatch
Updates
-
Making way for something new. 💪💥 Our #Decommissioning and #Demolition solutions help clients remove unwanted assets from their properties, making room for something new to benefit their communities for years to come 🎥 Learn more.
-
#ClimateChange is bringing profound changes to the water cycle. 💧🔁 How are U.S. #WaterUtilities adapting to ever-evolving conditions to prepare for threats and hazards? Our 2024 #WaterReport brings the answer to the surface. Learn more: http://ms.spr.ly/6043lXldD #IndustryInsights
-
Celebrating our #SummerInterns! 🎉 We want to take a moment to thank our #Interns for all the hard work and value they bring to our organization. In honor of #NationalInternDay, we've highlighted a few of our seasonal squad members. Check out what they have to say. ⬇️
-
Modernizing Miami 🌴 As part of their multi-year Capital Improvement Program, the Miami-Dade Water and Sewer Department is upgrading, enhancing and expanding critical #WastewaterPlant elements during the next eight years. Learn more about our scope of work as the design and #Engineering services team for renewal and replacement projects at its three #WastewaterTreatmentPlants: http://ms.spr.ly/6042lnhis
-
#WaterConservation is a critical consideration when looking to improve a #FoodAndBeverage facility's sustainability footprint. 👣 We share a few ways in which #Manufacturing facilities can potentially reuse water. ⬇️ Download our eBook for more tips on deploying #FutureReady F&B facilities: http://ms.spr.ly/6048lVaKm
-
As summer ramps up, so does the temperature. 🌡☀ To protect indoor and outdoor workers from extreme heat, the U.S. Department of Labor has proposed a new rule that would require employers to develop a Heat Injury and Illness Prevention Plan. 🦺 Construction Dive outlines the full proposal: http://ms.spr.ly/6048lVt8Y #ConstructionSafety #HealthandSafety
This content isn’t available here
Access this content and more in the LinkedIn app
-
More resiliency for Morro Bay 💧 The previous Morro Bay #WastewaterTreatmentPlant (WWTP) was located directly along the coastline, making it vulnerable to flooding from sea level rise. To solve direct #Flooding concerns and proactively address future water needs, the City of Morro Bay decided to construct a new advanced treatment facility. As part of a #DesignBuild joint venture with J.R. Filanc Construction, our team proposed a biological nutrient reduction (BNR) with a membrane bioreactor (MBR) system that was more cost-effective than competing sequencing batch reactor (SBR) technologies while producing higher quality effluent to further the city’s goal of protecting the marine environment. The new WRF has been operating since October 2022 and the project was completed in March 2024. 💪
-
-
#LinkedInLive last call 📞 With the U.S. #DataCenter market size estimated to approach $100 billion by 2027, the industry has increasing #Infrastructure demands and challenges to overcome. Join our experts in just TWO DAYS as they break down how to implement timely and resilient access to #EnergySolutions for your DC. Register before it's too late! ⏰⬇
Future-Ready Data Centers When Power is an Obstacle | LinkedIn
linkedin.com
-
Companies want their water use and discharge to be as small as possible. �💧 Helping them get there, our team conducts vulnerability assessments, evaluations and planning – providing a fresh perspective and enabling informed decisions about #WaterRisks across geographies, #ValueChains and product portfolios. We share some of our #Commercial water management expertise here: http://ms.spr.ly/6040lPV8q