Kit Switch reposted this
📢 Happening Tomorrow! This Wednesday, June 12th, we’ll dive into the logistics of offsite construction and explore its potential for efficiency, affordability, and safety. If you’re part of the BuiltWorlds ecosystem, come learn about Kit Switch's offsite supply chain, along with insights from Justin Schwaiger (KOPE) and Vikas Enti (Reframe Systems). Register here: https://lnkd.in/gWzYB3Cs
Prefabrication, modular, panelization, precast—all types of construction in which a large portion of the actual construction process takes place away from the site the structure will ultimately occupy. Most professionals in the AEC world have no problems wrapping their heads around that aspect of the offsite construction process. Where things get hazy, at least for the uninitiated, is in the logistics of it all. How do you get a fully or partially assembled structure safely, efficiently, and affordably from the factory to the jobsite? Is it worth the effort? Why? On June 12, those (and more) are the questions we'll be aiming to answer in a discussion led by BuiltWorlds Research Analyst Sean Wrenn and featuring KOPE General Manager (US) Justin Schwaiger, Kit Switch Co-Founder and CEO Armelle Coutant, and Reframe Systems CEO Vikas Enti, all of whom can speak to the matter in real-world terms, using real-world examples. Register now to reserve your spot on the call: https://lnkd.in/gWzYB3Cs #ConstructionTech #BuildingTech #Modular #Prefab #Panelization #OffsiteConstruction #AECIndustry